Coosa Valley Water Supply District
Published drinking-water records and contacts for Coosa Valley Water Supply District. System AL0001805. Review sources and dates; not a real-time water assessment.
- System ID
- AL0001805
- State or territory
- AL
- Published population served
- 25
- System type (source code)
- CWS
Published records and dates
- Lead and copper monitoring summaries: 15 — 2012-01-01 – 2025-12-31
- Alabama ADEM historical PFAS detections — August 2023 report: 36 — 2020-02-19 – 2023-04-12
Missing records here do not mean the provider did not test. Published records are not a real-time assessment of your tap water.
Published testing results
Selected recent records are shown below. Different sampling locations and dates are not interchangeable. These excerpts are not a complete testing history.
“<” means below the stated reporting limit, not zero. A reported measurement alone is not a safety verdict. Read an example
Lead and copper: 90th-percentile summaries
These describe a monitoring period across sampled locations, not the result at your home. How to read the 90th percentile
| Substance | Published 90th percentile | Monitoring period | Source quarter |
|---|---|---|---|
| Lead (PB90) | 0 mg/L | 2025-01-01 – 2025-12-31 | 2026Q3 |
| Lead (PB90) | 0 mg/L | 2024-01-01 – 2024-12-31 | 2026Q3 |
| Lead (PB90) | 0.003 mg/L | 2023-01-01 – 2023-12-31 | 2026Q3 |
| Lead (PB90) | 0 mg/L | 2022-01-01 – 2022-12-31 | 2026Q3 |
| Lead (PB90) | 0.0007 mg/L | 2021-01-01 – 2021-12-31 | 2026Q3 |
| Lead (PB90) | 0 mg/L | 2020-01-01 – 2020-12-31 | 2026Q3 |
| Lead (PB90) | 0.007 mg/L | 2019-01-01 – 2019-12-31 | 2026Q3 |
| Lead (PB90) | 0 mg/L | 2018-01-01 – 2018-12-31 | 2026Q3 |
| Substance | Published result | Sample date | Location / source |
|---|---|---|---|
| PFBS | 13.0 ppt | 2023-04-12 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 3.3 ppt | 2023-04-12 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOA | 4.5 ppt | 2023-04-12 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHxA | 5.3 ppt | 2023-04-12 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFBS | 12.0 ppt | 2023-01-11 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 2.8 ppt | 2023-01-11 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOA | 3.7 ppt | 2023-01-11 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHpA | 1.5 ppt | 2023-01-11 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHxA | 5.3 ppt | 2023-01-11 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFBS | 1.1 ppt | 2022-12-07 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 7.0 ppt | 2022-12-07 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOA | 1.2 ppt | 2022-12-07 | TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
State sampling points can include untreated water. Publisher qualifiers and units are retained; consult the full source notes before interpreting a record.
Download state records with source notes (CSV)
Published compliance history
7 imported records. Status is as recorded in the source; historical records are not current advisories. Missing records do not establish that no violations occurred.
| Rule / record | Period | Recorded status | Health-based (EPA classification) | Source quarter |
|---|---|---|---|---|
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2021-10-01 – 2021-10-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2021-10-01 – 2021-10-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2021-10-01 – 2021-10-31 | Resolved | No | 2026Q3 |
| Stage 2 Disinfectants and Disinfection Byproducts Rule / Monitoring and Reporting (DBP) | 2021-07-01 – 2021-09-30 | Resolved | No | 2026Q3 |
| Stage 2 Disinfectants and Disinfection Byproducts Rule / Monitoring and Reporting (DBP) | 2021-07-01 – 2021-09-30 | Resolved | No | 2026Q3 |
| Lead and Copper Rule / Follow-up Or Routine LCR Tap M/R | 2021-01-01 – — | Resolved | No | 2026Q3 |
| Lead and Copper Rule / Lead Consumer Notice | 2019-01-01 – — | Resolved | No | 2026Q3 |
Source dates and refresh checks
A refresh check is not a sample date. Publication periods, sample dates and checks are shown separately.
- EPA SDWIS lead/copper summaries and service areas — source period: — – —; last checked: 2026-10-17
- EPA SDWIS contacts and compliance records — source period: — – —; last checked: 2026-10-17
- EPA UCMR 5 sample results — source period: 2023-01-03 – 2026-06-17; last checked: 2026-10-17
- Alabama ADEM historical PFAS detections — August 2023 report — last successful check: 2026-10-15
Administrative contact (EPA filing)
Bailey, Jimmy: 205-472-3751
An administrative filing contact may not be a customer-service line. Confirm current contact details with the provider.