City of Talladega Water & Sewer Board
Published drinking-water records and contacts for City of Talladega Water & Sewer Board. System AL0001260. Review sources and dates; not a real-time water assessment.
- System ID
- AL0001260
- State or territory
- AL
- Published population served
- 20250
- System type (source code)
- CWS
Published records and dates
- PFAS / lithium (EPA UCMR 5): 360 — 2025-02-20 – 2025-11-13
- Lead and copper monitoring summaries: 20 — 1992-07-01 – 2024-12-31
- Alabama ADEM historical PFAS detections — August 2023 report: 61 — 2020-08-11 – 2023-05-09
Missing records here do not mean the provider did not test. Published records are not a real-time assessment of your tap water.
Published testing results
Selected recent records are shown below. Different sampling locations and dates are not interchangeable. These excerpts are not a complete testing history.
“<” means below the stated reporting limit, not zero. A reported measurement alone is not a safety verdict. Read an example
| Substance | Published result | Reporting limit | Sample date | Sampling location |
|---|---|---|---|---|
| 11Cl-PF3OUdS | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| 4:2 FTS | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| 6:2 FTS | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| 8:2 FTS | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| 9Cl-PF3ONS | < 0.002 µg/L | 0.002 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| ADONA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| HFPO-DA | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| NEtFOSAA | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| NFDHA | < 0.02 µg/L | 0.02 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| NMeFOSAA | < 0.006 µg/L | 0.006 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFBA | < 0.005 µg/L | 0.005 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFBS | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFDA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFDoA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFEESA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFHpA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFHpS | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFHxA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFHxS | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFMBA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFMPA | < 0.004 µg/L | 0.004 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFNA | < 0.004 µg/L | 0.004 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFOA | < 0.004 µg/L | 0.004 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFOS | < 0.004 µg/L | 0.004 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFPeA | < 0.003 µg/L | 0.003 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFPeS | < 0.004 µg/L | 0.004 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFTA | < 0.008 µg/L | 0.008 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFTrDA | < 0.007 µg/L | 0.007 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| PFUnA | < 0.002 µg/L | 0.002 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
| lithium | < 9 µg/L | 9 µg/L | 2025-11-13 | Talladega Water Plant / 12601260126012601260 |
Download all EPA UCMR 5 records (CSV)
Lead and copper: 90th-percentile summaries
These describe a monitoring period across sampled locations, not the result at your home. How to read the 90th percentile
| Substance | Published 90th percentile | Monitoring period | Source quarter |
|---|---|---|---|
| Lead (PB90) | 0.001 mg/L | 2022-01-01 – 2024-12-31 | 2026Q3 |
| Lead (PB90) | 0.003 mg/L | 2019-01-01 – 2021-12-31 | 2026Q3 |
| Lead (PB90) | 0 mg/L | 2016-01-01 – 2018-12-31 | 2026Q3 |
| Lead (PB90) | 0.001 mg/L | 2013-01-01 – 2015-12-31 | 2026Q3 |
| Lead (PB90) | 0.001 mg/L | 2009-01-01 – 2011-12-31 | 2026Q3 |
| Lead (PB90) | 0.003 mg/L | 2008-01-01 – 2010-12-31 | 2026Q3 |
| Lead (PB90) | 0.003 mg/L | 2005-01-01 – 2007-12-31 | 2026Q3 |
| Lead (PB90) | 0.003 mg/L | 2002-01-01 – 2004-12-31 | 2026Q3 |
| Substance | Published result | Sample date | Location / source |
|---|---|---|---|
| PFOS | 6.1 ppt | 2023-05-09 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOA | 2.1 ppt | 2023-05-09 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHxS | 4.1 ppt | 2023-05-09 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 3.0 ppt | 2023-05-09 | BINGHAM ST. WELL + TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 2.1 ppt | 2023-05-09 | HARMON PARK WELL TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 4.0 ppt | 2023-04-12 | SLOAN AVE. WELL + TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHxS | 2.5 ppt | 2023-04-12 | SLOAN AVE. WELL + TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
| PFBS | 1.0 ppt | 2023-02-14 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOS | 4.5 ppt | 2023-02-14 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFOA | 1.4 ppt | 2023-02-14 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFHxS | 3.3 ppt | 2023-02-14 | AMANDA BINGHAM PARK WELL TREATMENT PL / Alabama ADEM historical PFAS detections — August 2023 report |
| PFBS | 0.6 ppt | 2023-02-14 | BINGHAM ST. WELL + TREATMENT PLANT / Alabama ADEM historical PFAS detections — August 2023 report |
State sampling points can include untreated water. Publisher qualifiers and units are retained; consult the full source notes before interpreting a record.
Download state records with source notes (CSV)
Published compliance history
32 imported records. Status is as recorded in the source; historical records are not current advisories. Missing records do not establish that no violations occurred.
| Rule / record | Period | Recorded status | Health-based (EPA classification) | Source quarter |
|---|---|---|---|---|
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2025-07-01 – 2025-09-30 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2025-07-01 – 2025-09-30 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2025-07-01 – 2025-09-30 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2025-07-01 – 2025-09-30 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2022-10-01 – 2022-12-31 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2022-10-01 – 2022-12-31 | Archived | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2022-10-01 – 2022-12-31 | Resolved | No | 2026Q3 |
| Radionuclides and Revised Rad Rule / Monitoring, Regular | 2022-10-01 – 2022-12-31 | Archived | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2017-05-01 – 2017-05-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2017-04-01 – 2017-04-30 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2017-03-01 – 2017-03-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2017-02-01 – 2017-02-28 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2017-01-01 – 2017-01-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2016-12-01 – 2016-12-31 | Resolved | No | 2026Q3 |
| Long Term 2 Enhanced Surface Water Treatment Rule / Monitoring, Source Water (LT2) | 2016-11-01 – 2016-11-30 | Resolved | No | 2026Q3 |
| Interim and Long Term 1 Enhanced Surface Water Treatment Rule / Monitoring, Turbidity (Enhanced SWTR) | 2003-08-01 – 2003-08-31 | Archived | No | 2026Q3 |
| Inorganic Chemicals / Monitoring, Regular | 1996-01-01 – 1996-12-31 | Archived | No | 2026Q3 |
| Arsenic Rule / Monitoring, Regular | 1996-01-01 – 1996-12-31 | Archived | No | 2026Q3 |
| Inorganic Chemicals / Monitoring, Regular | 1996-01-01 – 1996-12-31 | Archived | No | 2026Q3 |
| Inorganic Chemicals / Monitoring, Regular | 1996-01-01 – 1996-12-31 | Archived | No | 2026Q3 |
Source dates and refresh checks
A refresh check is not a sample date. Publication periods, sample dates and checks are shown separately.
- EPA SDWIS lead/copper summaries and service areas — source period: — – —; last checked: 2026-10-17
- EPA SDWIS contacts and compliance records — source period: — – —; last checked: 2026-10-17
- EPA UCMR 5 sample results — source period: 2023-01-03 – 2026-06-17; last checked: 2026-10-17
- Alabama ADEM historical PFAS detections — August 2023 report — last successful check: 2026-10-15
Administrative contact (EPA filing)
Schuffert, Ken: 256-965-3791
An administrative filing contact may not be a customer-service line. Confirm current contact details with the provider.